Standard Terms & Conditions • Version 2026.1

Interior Design & Execution Agreement

Please review our official policy governing architectural quotations, factory production releases, site obligations, and warranty commitments.

Policy Overview: This document outlines the binding terms and conditions governing all quotations, design plans, and execution schedules provided by Ply Interiors in operational collaboration with Bro Builders[cite: 2, 4]. Acceptance of the project quotation or remittance of advance token implies unconditional agreement to the 9 clauses detailed below[cite: 2].
01

Estimate vs. Final Execution Billing

The quotation is strictly an initial cost estimate based on preliminary layouts and initial architectural drawings[cite: 2]. Final billing will be settled on actual site measurements, finalized material selections, and verified execution quantities[cite: 2].
02

Plan Revisions & Additional Charges

Any modifications, scope extensions, or deviations requested during the work period will incur additional charges[cite: 2]. Adjustments will be calculated transparently based on material variations and extra labor hours[cite: 2].
03

Single Point of Contact & Direct Labor Protocol

All instructions and change requests must route strictly through the authorized Ply Interiors Project Lead[cite: 2, 3]. Clients must not issue direct instructions to on‑site workers[cite: 2, 3]. Ply Interiors is not liable for unauthorized alterations made with site workers[cite: 2].
05

Non‑Refundability Policy

All token advances and milestone disbursements are non‑refundable, as funds are committed immediately toward project execution, bulk raw board allocation, and CNC cutting schedules[cite: 2].
04

Milestone Payment Schedule & Terms

Site operations, modular production, and deliveries are strictly synchronized with the clearance of the milestone stages below[cite: 3]:
Milestone Phase Disbursement % Operational Stage
1. Project Booking 10% Advance Token Design Kickoff, Site Measurements, and Architectural CAD Sign-Off
2. Material Order Initiation 50% Disbursement Raw Plywood Allocation, CNC Factory Sizing, and Lamination Release
3. On Receipt of Material 30% Disbursement Dispatch to Site, Vertical Haulage, and Carcass Framework Assembly
4. Final Handover 10% Balance Snag List Rectification, Final Cleaning, and Possession Key Handover

Site operations or deliveries are paused automatically if payments remain unsettled beyond 3 business days of the milestone[cite: 3].

06

Essential Site Utilities & Clearances

The Client is responsible for securing building permissions and ensuring continuous power and water supply[cite: 2, 3]. Delays due to restrictions or utility outages extend the handover timeline[cite: 2, 3].
07

Vertical Material Transport

Estimates assume continuous access to a service elevator[cite: 2]. If unavailable, manual haulage charges will be billed based on actual labor costs[cite: 2].
08

Worker Stay During Execution

For seamless completion, Ply Interiors technicians and carpenters will remain stationed at the site during execution, utilizing basic available amenities.
09

Warranty & Final Handover

Materials comply with brand warranties (10‑Year BWR / 15‑Year BWP, as per selection). A workmanship warranty applies for 1 year from handover[cite: 3]. Keys and site possession are transferred upon full financial clearance[cite: 3].